“A” Extension TXL 37

“A” Extension unit of Mezzanine TXL 37 enables to increase the size of the structure in the direction of the primary beams. This extension allows to extend the usable space up to 74 m².
The unit includes two simple columns which are adjustable in height, the flooring to cover the entire surface and a light slab that is also adjustable in its both sides. The features of this slab are the exact same as the ones of the Mezzanine TXL 37 and it is extensible up to 37 m².

Learn more about our innovative industrial range.

More details

Preview the shipping fees

$14,327


Ask us about the waterproof option

Add to wishlist

Customer ratings and reviews

Nobody has posted a review yet

Customers who bought this item also bought

More info

The products can be located indoors and outdoors taking into account some recommendations.

Our mezzanines are considered as movable assets and do not need building permits or licenses. Tecro Space, SL is not responsible of the use or inadequate installation of the product.

The material will be delivered at street level (curbside delivery) by an external transport company. 

Data sheet

Kind of productOnly Mezzanine
RangeIndustrial XL
Maximum height above the flooring board (inch) (HT)150
Height-adjustable every (inch)2 1/2
Total maximum load (Lb)37385
Maximum length of the primary beam (inch) (LT)240
Minimum length of the primary beam (inch) (LT)177
Maximum length of the secondary beam (inch) (DT)219
Minimum length of the secondary beam (inch) (DT)128
Maximum area (ft²)365.11
Minimum area (ft²)157.91
Load capacity in its minimum extension (lb/ft²)245
Load capacity in its maximum extension (lb/ft²)102.4

Reviews

Be the first to write your review !

Faqs

    What does the kit include?

    Tecrostar mezzanines and stairs are supplied with everything you need to install the kit at its maximum surface area or height.

    • All the beams and columns
    • The floor panels
    • All the nuts and bolts
    • Wall anchors
    • Assembly manual
    • Anchors for anchoring the columns to the floor

    Personalised phone or email service from our specialists


    Do they support the same weight as the main structure?

    Yes. They have the exact same specifications as the initial structure.


    Can I add an extension in the future?

    Yes, you can add an extension to an existing mezzanine. You do not need to buy both structures at the same time.


    Can an extension be installed to a mezzanine from a different range?

    No, the extension cannot be integrated and share columns. However, structures can be placed side by side and achieve continuity of the floor but you will not save any columns and there will be two columns together at the joints.


    How is it installed?

    To install Tecrostar mezzanines you need 2 adults (they do not need to be DIY experts). It is recommendable to use personal safety equipment like gloves, boots, etc. in order to avoid accidents.

    When installing range L mezzanines you may need to use some type of scaffolding or ladder for working at heights and manual or electric lifting machinery to raise the primary beams, particularly if the structure is more than 3m high. The other ranges can be lifted easily by hand.

    You will need the following tools to install the mezzanines: tape measure, some type of spanner for m10 and m8 bolts and a screwdriver (an electric screwdriver will make the task much easier), spirit level, drill and a tool for cutting the panels (saw, jigsaw, circular saw, etc.)

    You can find all the tools required to assemble it and tested by Tecrostar in the tools section.

    All the models are installed by following these steps:

    Pre-assemble the structure on the floor in the desired area.

    Raise the outer structure to the desired height.

    Finish assembling the structure and floor.


    How long does it take to install?

    You can do it yourself with the help of a friend. It is easily installed in a few hours, depending on the product.

    TS8 Mezzanine: 3 hours with 2 people

    TM15 Mezzanine: 4 hours with 2 people

    TL30 Mezzanine: 5 hours with 3 people

    The times are a guideline and for assembly only. You need to add the time it takes to measure up, move the components to the location, clean up, etc.


    What if the access to the delivery address is complicated? 

    Sometimes, the carrier cannot access to point of delivery due to an extremely narrow street or any other difficulty. In such cases, the carrier cannot do the delivery with the usual truck and he may need to use a different vehicle or extra support. If the carrier considers that the point of delivery is complicated, request a quotation. If you don’t inform in advance that the access is complicated, the delivery will be paralysed until you pay the extra cost.


    Is the XL range delivered differently?

    There is a slight difference with the rest of the ranges. In order to deliver mezzanines XL, the delivery location should be accessible to a truck/long trailer (maximum mass admitted up to 36t). If there are access restrictions for this kind of trucks, there could be additional costs due to the necessity of transferring the merchandise to a smaller vehicle. Should you believe it exists any kind of restriction, please contact us.

    The customer should take care of the merchandise unloading process. That unloading should be made from the lateral sides of the truck (this kind of truck do not have back liftgate).

    We deliver the product packed with pallets at the bottom, so its unloading should be made preferably with a forklift.


Do you want to know more about Mezzanines Online?

Join our newsletter and discover Sector news, client pics and new products. Further, you could get early access to super offers and limited discounts.